Selected Project Experience
Kentucky Speedway Utilizing GPS technology, provided construction layout on a 900-acre site in Sparta, Kentucky. At times, provided up to 4 GPS survey crews in order to keep pace with the aggressive timetable of the project.
Greater Cincinnati Airport Utility location surveys and plan preparation employing GPS.
Cincinnati Reds/Great American Ballpark Project Surveyor selected by the Hunt Group and the Hamilton County Commissioners to oversee the survey control and layout of improvements for the new Cincinnati Reds/Great American Ballpark.
Clermont County Sewer District Field boundary locations employing GPS. Preparation of legal descriptions and exhibits required for the acquisition of 15 miles of right-of-way.
Butler County Regional Highway Survey support for the design of a 6-mile segment of limited access divided highway. Preparation of over 60 legal descriptions and related plats required for right-of-way acquisition. Employed extensive GPS for setting of final right-of-way corners.
Interstate 75, HAM/BUT-75-26.441/0.00 Utilizing GPS, recovered and located reference monuments on a 7-mile segment of I-75 for establishment of centerline control for highway upgrade. With an ATV (All Terrain Vehicle) mounted real-time GPS, performed a topographic survey of a 250’-wide grass median, 7 miles long.
Clermont County Sewer District Field boundary locations utilizing GPS. Preparation of legal descriptions and exhibits required for the acquisition of 15 miles of right-of-way.
City of Cincinnati CitiRama I, survey and site design coordination for inner city home show sponsored by the Home Builders Association of Greater Cincinnati.
Rumpke, Inc., Georgetown, Ohio; City of Wilmington, Ohio Construction layout and GPS support for the construction, capping and certification of landfill cells.
Transystems – ( CSX ) Topographic and boundary survey for the redesign of the Collinwood Railyard, Cleveland, Ohio. GPS control for mapping and design.